Posted by Frank Woods on Jan 28, 2019
On Saturday, January 12, several Rotarians under the direction of Justin Raithel, installed the decking on the long boardwalk on the bike trail that parallels Glenn between Sibley and Folsom Blvd.  The project started at 8 AM and was done about 1 PM.  As usual, refreshments were available.  The club demolished this deck on December 16.
 
 
Photos of the project are available at Bike Trail Project - Long Boardwalk
Demolition photos are at Second Bike Trail Project.